A leading offshore operator required to plug an open-hole section to establish a kickoff point as part of a sidetrack drilling operation in a deep-water well in Western Australia. The original plan was to set a balanced cement plug on top of a high-viscosity pill across the 17-1/2″ open-hole section. This approach failed to provide the stability needed for sidetrack drilling as no hard cement was found at setting depth during a subsequent run. The contingency plan was to callout an IPI Permanent Inflatable Bridge Plug (PIBP), which was available on standby in a nearby location as part of a concurrent decommissioning campaign managed by the same operator. The PIBP was selected to provide a false-bottom as a base for the cement plug in the open hole section, eliminating the risk of cement swapping with mud.
The challenges and requirements associated with the job were as follows:
IPI supplied a 5-1/2” PIBP chassis configured with a 7-3/4” OD inflation element for this application. Equipment and field personnel were mobilized from a neighboring P&A operation to the rig within hours from the original request. The increased modular adaptability of the PIBP product line allowed for the inflation valve shear-pin configuration to be adjusted on location in order to provide a tailored solution. In order to manage the risk of clogging the inflation valve and inflate with clean fluid, the first workstring joints were pre-filled with fresh water, followed by a viscous spacer column to isolate the inflation volume from the heavy mud located throughout the rest of the workstring. The PIBP was successfully set at the required location allowing the cement to properly cure across the desired interval. The cement column built up sufficient mechanical stability across the kickoff point, allowing the operator to sidetrack from the well and carry on with the drilling program as planned.
IPI’s solution generated the operator substantial savings in operational expenditure as it allowed the deep-water rig to resume operations in a timely manner. After the job, the IPI field representative returned to the neighboring job site he was dispatched from to resume operations in the concurrent P&A campaign, and a replacement PIBP was mobilized from IPI’s manufacturing facility without interrupting the client’s decommissioning campaign.
Discover why we’re the market leader for Inflatable Packers across a variety of industries
Stuart recently joined IPI as the Director of Oil and Gas, bringing with him 15 years of diverse experience in the industry, with a strong focus on inflatable packers. His extensive background encompasses a variety of roles, including field engineering, operations management, sales, and business development. This breadth of expertise, coupled with his international experience in markets across North America, Europe, Australia, and the Middle East, positions Stuart to effectively lead and expand IPI’s oil and gas operations on a global scale. Stuart holds a Master’s degree in Mechanical Engineering from the University of Aberdeen and a Master’s degree in Finance from City University of London. His robust technical foundation and financial acumen uniquely empower him to drive strategic initiatives and foster growth within the company.
Made Differently, Perform Better
Discover why we’re the market leader for
Inflatable Packers across a variety of industries.